Industrial land
- Plots serviced to the boundary fence
- For investors with their own line design who want full control of construction
- Large plots can be split or combined
Thanh Hoa · Vietnam
A production base for a new generation of investors
Project overview
On the National Road 45 corridor
Established under Decision 4036/QD-UBND, amended by 4235/QD-UBND. The 1/500 detailed plan received its second partial adjustment under Decision 707/QD-UBND on 15 Sep 2025. A land-use rights certificate for 597,280.4 m² has been issued for 50 years from 14 Jan 2026.
Electronics, telecoms, IT, watches (C26); software (J58200)
Mechanical engineering, electrical machinery, parts (C28); electrical equipment (C27); supporting components (C32900)
Textiles excl. dyeing (C13), garments (C14), footwear (C15200); wood, rattan, bamboo (C162); furniture (C31001)
Agro-food processing (C10); medical devices (C32501); building materials (C239); packaging; plastics & composites

Total area
Equivalent to 60 ha
Industrial land
70% of total area
Lease term
Until 2076
Minimum plot
70% building coverage
Strategic location
Road · Rail · Sea · Air
Distances measured along existing roads.
Investment context
Updated 2026
Vietnam's third most populous province, served by all five modes of transport. 2026 targets: GRDP growth of at least 11%, with industry and construction growing 14% and making up 50.7% of the economy.
Population
Third largest in Vietnam
Of working age
Young, abundant workforce
GRDP growth 2025
7.21% in H1 2026
Budget revenue H1 2026
Highest in North Central region
New businesses H1 2026
Up 29% year on year
Investment projects H1 2026
VND 11,395 bn registered
FDI projects H1 2026
USD 137.2 m registered
Capital disbursed H1 2026
Up 8.1% on H1 2025
Source: Thanh Hoa Statistics Office, Department of Finance, Department of Industry and Trade — figures published in 2026.
1/500 detailed plan
Approved land use structure
Master land use plan · Decision 5199/QD-UBND · 11 Nov 2022 · Open full-size plan
Technical infrastructure
Tenants only connect within their own plot
From An Binh Water Plant, Quang Van commune (Decision 3324/QD-UBND).
10,000 m³/day
Medium-voltage line runs directly through the site for easy connection.
110 kV Nui Mot substation · 2 × 63 MVA
Central plant on site; wastewater estimated at 80% of water supplied.
1,100 m³/day
Separate underground systems for stormwater and wastewater.
Independent systems
Hydrants along every internal road.
Meets current QCVN standards
Underground fibre; green space and water surfaces to standard.
61,882 m² green space · 10.4%
Main road 1-1
2 × 12 m carriageway · 2 m median
Branch road 2-2
10.5 m carriageway · 5 m sidewalks
National Road 45
19 m carriageway · project frontage

Internal road cross-sections · 1/500 plan

Target industries
Under Decision 4235/QD-UBND of 23 Oct 2024 by Thanh Hoa Provincial People's Committee, Quang Yen is a general multi-sector cluster, with a much wider scope of permitted activities than a typical industrial cluster.
Electronics, telecoms, IT, watches (C26); software (J58200)
Mechanical engineering, electrical machinery, parts (C28); electrical equipment (C27); supporting components (C32900)
Textiles excl. dyeing (C13), garments (C14), footwear (C15200); wood, rattan, bamboo (C162); furniture (C31001)
Agro-food processing (C10); medical devices (C32501); building materials (C239); packaging; plastics & composites
Electronics, telecoms, IT, watches (C26) · Software (J58200) · Building materials, tiles, gypsum (C239) · Electrical machinery and parts (C28) · Household and industrial electrical equipment (C27) · Supporting components (C32900) · Mechanical engineering and machinery repair · Precision manufacturing · Ceramics (C23) · Forest products, wood, rattan, bamboo (C162) · Furniture and office equipment (C31001) · Consumer goods, plastic and metal (C32900) · Textiles excl. dyeing (C13) · Garments (C14) · Footwear (C15200) · Sports goods (C32300) · Toys (C32400) · Jewellery (C32900) · Agro-forestry-fishery and food processing, animal feed (C10) · Medical devices (C32501) · Packaging (C16230, C17021, C22201) · Plastics and composites (C32900)
Warehousing, storage and sorting centres (F429) · Handicrafts and gifts (C329)
Gas filling (D3520) · Chemicals (C2011x) · Glass and crystal (C23) · Paint (C20221) · Pharmaceuticals (C21002) · Beer (C11030), beverages (C1104) · Medicines (C21001) · Printing (C18110) · Printing ink (C20222)
Products
Flexible to each investor's scale and schedule
Costs & incentives
Transparent enough to budget straight away
Every cost across the lease cycle is published, so investors can prepare a budget immediately.
Land lease
USD 90/m²
For the full lease term · paid by milestone, flexible terms
Infrastructure management fee
VND 19,500/m²/year
Maintenance, charged on total leased area
Wastewater treatment
VND 14,500/m³
Based on registered discharge capacity
Clean water
Local tariff
At the water supplier's prevailing tariff
Electricity
EVN tariff
Production tariff by normal / off-peak / peak hours
Green energy
Rooftop solar
Support to invest in and use solar power at a lower production cost
Investment incentives
Developer support
2026 unit prices are approved; prices are revised annually with official notice.
Legal & timeline
50 years from 14 Jan 2026
All foundational legal documents are complete. The land-use rights certificate covers parcel 1287, map sheet 12, industrial cluster land (SKN).
Industrial cluster land (SKN) · 50-year term from 14 Jan 2026 · Exclusive use · Issued by Quang Yen Commune People's Committee in 2026
Infrastructure phasing
Decision 4036/QD-UBND
Project code 8453112087
Decision 5199/QD-UBND
Decision 707/QD-UBND
Land-use certificate issued
Cleared site handed over for construction
In progress
First agreements with secondary investors
Phase 1 infrastructure complete
Investment process
From deposit to signed lease — counted from receipt of a complete file
An experienced industrial developer that has filled multiple projects nationwide and attracted multinational groups.
2.6 million workers, nearly 73% trained, about 11,000 newly trained each year.
Over 21,000 active businesses and USD 14.6 bn of valid FDI from 20 countries.
All five modes of transport, next to large, growing residential areas.
Project news
Quang Yen Industrial Cluster officially breaks ground
On the morning of 20 October 2026, Tan Dong Hiep Group held the groundbreaking ceremony for Quang Yen Industrial Cluster in Quang Yen commune, Thanh Hoa Province, attended by local leaders, partners and secondary investors. The developer signed cooperation agreements with its first secondary investors at the ceremony.
Quang Yen Industrial Cluster groundbreaking video · Watch on YouTube
Developer capability
Lasting projects – a solid future
Founded in 1990, Tan Dong Hiep is now a multi-sector group with more than twenty member companies. Quang Yen Industrial Cluster is developed directly by Dai Loc Real Estate Investment Trading Co., Ltd., a member of the Tan Dong Hiep ecosystem.
Development experience
Operating continuously since 1990
Ecosystem members
Multi-sector, nationwide
Business lines
Financial capacity
Total assets
Group, member companies and portfolio
Land bank
Across many provinces
Quang Yen capital
Registered project investment
Partnership commitments
From international groups and financial institutions
Why it matters for secondary investors
Industrial parks developed by the Group in southern and northern Vietnam are fully occupied — we understand factory connection and operating needs.
Over VND 10,000 bn in assets and a 1,000 ha land bank — the capacity to deliver infrastructure on the committed phases.
More than 20 members in logistics, cold storage, food, education and housing.
Support from investment incentives and certificates to construction permits and land-use certificates.
Agreement with SEP Group of a Korean national university of technology to develop a carbon-neutral cluster — opening the way to carbon credits and tax incentives.
Group leaders hold executive roles in major business associations, easing partner and government engagement.
Quang Yen Industrial Cluster
Leave your details and the project management board will send the project profile, plot options and a quotation that fit your needs.
FAQ
Land lease is USD 90/m² for the full term (until 2076), paid by milestone. The infrastructure management fee is VND 19,500/m²/year; wastewater treatment VND 14,500/m³; power at EVN tariff; water at the local tariff. These are 2026 prices and may be revised annually.
5,000 m². Larger plots can be split or combined; building coverage 70%, floor area ratio 2.1, maximum height 19 m.
Yes. The certificate covers parcel 1287, map sheet 12, 597,280.4 m² of industrial cluster land (SKN), for 50 years from 14 Jan 2026.
Phase 1 (about 40 ha) infrastructure completes before Dec 2026 and the cluster welcomes investors from Q4 2026. Phase 2 (about 20 ha) is in use before Dec 2027.
About 60 days from receipt of a complete file, following an eight-step process. Dai Loc supports investment registration, construction permits and the land-use certificate.
Quang Yen is a general multi-sector cluster with 30+ industry groups under Decision 4235/QD-UBND. Some activities such as chemicals, paint, pharmaceuticals, beer and printing are permitted with conditions. Send us your industry code to check.